Subject: Core samples
We have taken 3 inch (diameter) core samples from a marble structure to access a concealed gutter system built into a cornice. The gutter provides drainage for any water that might enter through the mortar joints of the veneer panels of the dome above. After examining the gutter, we would now like to re-install the top portion of the cores in a manner that will allow us to remove them again at a later date if necessary. Has anybody designed such a connection? Karen Fix Architectural Resources Group Pasadena, CA *** Conservation DistList Instance 25:25 Distributed: Tuesday, November 22, 2011 Message Id: cdl-25-25-012 ***Received on Monday, 14 November, 2011